This is a board I finished some time ago and have hung onto as I like the look of it. 3mm Paulownia over a Core Fusion EPS blank which are more than rare now. The best EPS balnks we had on the Australian market for sure. Light weight and hard. The board has a 4oz glass job top and bottom , so it is pretty bullet proof but still light enough.
Monday, July 13, 2015
Monday, July 6, 2015
Monday, June 22, 2015
Wednesday, June 17, 2015
Glider progress
Lots of tape and a long way from one end to the other on an 11 footer.
Last rail band going on
The little block plane got pretty warm cleaning up the rail bands.
Sweet outline set off by the 3mm Cedar pinline
Saturday, June 6, 2015
Bagging the 11 foot glider
Getting this set up on the bench. I have the blocks in place and screwed to the table to hold the rocker and the 12 foot bag layed out on top ready to take the board.
I have decided to use some fibre glass fly screen mesh between the EPS and 5mm deck skin to see if it will give a little added support of my 6ft 3" 120 kg sitting on the board in this spot even thogh I will be glassing the finished board.
Bottom glued and 3mm skin in place. Time to start spreading the polyurethane glue.
You don't need alot of glue todo the job. You can see in the foreground how with the humidity it is starting to foam up.
All sealed up in the bag for 2 hours. Big job, big board.
Tuesday, June 2, 2015
5ft 10" x 21" x 2 1/2" @ 36 Litres Hydro V
Single to double to V out through the tail
The rounded hull shoulders on each side of the nose give way to a large concave but then blends into a chine that runs down each side. This captures the concaves and thins out the rail thickness as well before tapering into the V.
Monday, June 1, 2015
Monday, May 11, 2015
Sunday, May 10, 2015
9ft Alley Slider in the final stages.
The rails all cleaned up and ready to start shaping
It is a long way up and down the shaping bay with the handplane when it comes to shaping rails on a longboard. Starting to take shape.
Sunday, May 3, 2015
5ft simmons for Christian in Coffs Harbour
EPS core staright off the machine out on the lawn to cut off the rails
Rails off and all squarded up, ready to have 3mm of paulownia wrapped around.
Skins getting bagged on
All encapsulated in wood and trimmed up ready for laminating the rails on
Rail bands going on
2 more to go , that will be 3 x 5mm each
Rail bands all done , just the nose and tail blocks
Subscribe to:
Posts (Atom)


















































