Getting the glue down on Raz's 4ft 4" ready for bagging the top and bottom.
Bagging with a few blocks underneath to hold the rocker as the pressure comes on.
Laminating the rails one at a time , 4 x 5mm thick strips
The raw hot wired blank
First rail band glued onto the raw blank and then have it cut top and bottom on the AKU machine
Top and bottom vac bagged on and the rails cleaned up ready to laminate the rail bands on
The progressive steps
Getting warmed up
This is Ras's 4ft 4" x 22" x 2 1/4" @ 24 Lt.
Oiled and ready to go. Raz has named the board "The Chip"
He has stepped down to this from the 4ft 8"